Bridging Australia and the Arab World

Tuesday, 24 November 2026

Parents Urge Swift Repairs After Collingwood College Closure

Spread the love

Arabic version: الآباء يدعون إلى إصلاحات سريعة بعد إغلاق كلية كولينغوود

Parents are expressing frustration over delayed building repairs at Collingwood College in Melbourne, which recently closed an entire floor of its main building due to falling concrete. This incident occurred during the January school holidays when concrete chunks fell from a water-damaged roof, smashing through the ceiling of a science classroom. According to ABC News, parents, students, and local representatives have written to the state government demanding immediate action following years of roof issues.

The school council reported that the falling concrete could have seriously injured students had they been present during the incident. Parent and school council vice president Hannah Marshall noted that students had already been dealing with scaffolding for half of the previous year while repairs were underway. The recent incident, she said, was the final straw for the school community.

As a result of the closure, 65 Year 10 students are being relocated to a different campus for science classes. One student, Sam Rankin, mentioned that the absence of hands-on experiments has turned their studies into a “nightmare,” as they are limited to paper-based work. The indefinite closure of the second floor has also placed significant strain on teaching staff, who must manage more than 60 sessions per week in already crowded spaces.

Greens MP Gabrielle de Vietri highlighted the severity of the situation, stating that concrete was falling in large chunks that could seriously injure students. In her correspondence with the state government, she pointed out that the school serves a diverse student population, and the ongoing safety issues have led to increased frustration among families.

The Department of Education is currently assessing the building’s condition and has acknowledged the need for long-term repairs. A report from engineering firm DSL Consulting indicated that water damage has likely been occurring for many years, and several recommendations were made to address the problems. While the department has promised a full remediation of the roof, the second floor remains closed indefinitely, leaving the school community in a state of uncertainty.

About the Author​

More
articles